Prototype Facility

Prototype Facility in Massing (Germany)In order to perfom long term tests, a prototype facility of the BioChipFeeding system was installed at the company site of HDG Bavaria. The system provides the needed wood chips for the existing 400kW heating system.
The system features the large gripper variant (75 liters) and is powered by a crane system, which enables the system to operate in the wood chip bunker of 6 meters in width and 9 meters in length.
A safety system was installed as well in order to secure the BioChipFeeding system against tresassing while operating in automatic mode.